What is a concrete Waler?

Asked By: Eliana Vabbe | Last Updated: 28th January, 2020
Category: business and finance construction industry
5/5 (496 Views . 22 Votes)
waler (plural walers) (structural engineering) A plank of wood, block of concrete, etc., used for support or to maintain required separation between components in order to help maintain the form of a construction under stress.

Click to see full answer


Similarly, you may ask, what is a Waler in formwork?

wale, waler, whaler A horizontal timber or beam used to brace or support an upright member, as sheeting, formwork for concrete, etc.

Also Know, what is concrete formwork? Formwork is the term used for the process of creating a temporary mould into which concrete is poured and formed. Traditional formwork is fabricated using timber, but it can also be constructed from steel, glass fibre reinforced plastics and other materials.

In this way, what is a Waler beam?

Walers are structural beams mounted flush to the deck of the Unifloat concrete floating dock from Bellingham Marine. They attach to the float by long rods threaded at the ends.

What are concrete forms made of?

Insulating concrete forms are manufactured from any of the following materials: Polystyrene foam (most commonly expanded or extruded) Polyurethane foam (including soy-based foam) Cement-bonded wood fiber.

31 Related Question Answers Found

When should formwork be removed?

Walls and columns can be removed after about 24-48 hours. Slabs, with their props left under them, can typically be removed after 3-4 days. Soffits, with their props left under them, can be removed after one week.

What are the types of formwork?

Formwork comes in several types:
  • Traditional timber formwork. The formwork is built on site out of timber and plywood or moisture-resistant particleboard.
  • Engineered Formwork System.
  • Re-usable plastic formwork.
  • Permanent Insulated Formwork.
  • Stay-In-Place structural formwork systems.
  • Flexible formwork.

How do you calculate formwork for a concrete slab?

The formwork is measured in terms of area that is in contact with the concrete surface. For example, the formwork for concrete footing will be calculated as the surface area of four sides of foundation only. Bottom of the footing is resting on earth, there is no need of any formwork and top of footing is open.

Where is formwork used?

Formwork is used by creating moulds out of wood, steel, aluminium or prefabricated forms into which the concrete is poured. This is then allowed to harden and set after which it is stripped, or in the case of stay-in-place formwork it is left as part of the structure.

What is lost formwork?


Lost Formwork Systems. Planks of very high insulating extruded polystyrene formwork are used to frame a wall cavity into which concrete is poured to create a very energy efficient wall construction. The finished wall has high structural strength and is highly insulated.

What is the difference between shuttering and formwork?

Shuttering refers to the method of forming the mold using plywood while formwork is more of a broader term that's used to denote the process of creating a mold using a variety of materials. Both formwork and shuttering accomplish the same task, with the main difference being the materials used to accomplish the task.

What is the purpose of formwork?

Purpose and Use of Formwork. The formwork serves as mould for concrete structural components unless such mould is provided by the soil, other structural components, etc. It moulds the placedfresh concrete, which in this stage normally is viscous, to the shape specified in the drawing.

What are the requirements of formwork?

Requirements of Good Formwork
Entire formwork should be rigidly constructed and propped, so that there should be no deformation in the shape and retain its original shape. Deflection and shrinkage should be minimum. The joins should be tight enough to minimize the leakage of cement grout.

What is a capping beam?

The Capping beam is a steel and concrete beam that ties all the piling together, creates the foundation for the suspended slab and helps to hold the earth and neighbouring houses back. The steel reinforcement bars are placed over the top of the piling cages with ligs designed to the engineers specs.

When can I remove forms from concrete slab?


Removing forms before the concrete is truly dry.
The forms or “molding” that holds the concrete in place until it dries should be left alone for at least two days to ensure that the concrete is completely dry.

What is the difference between formwork and falsework?

CDOT, Section 601.11Falsework is defined as any temporary construction used to support vertical loads for a structure until it becomes self-supporting. Formwork is the temporary structure or mold used to retain plastic or fluid concrete in its designated shape until it hardens.

concrete waler

Formwork is kind of sheeting system provided for supporting loose concrete till its gets its own strength and the Scaffolding is a temporary structure that supports the people in the construction area.

What are the materials used for formwork?

Materials used for the construction of concrete formwork range from traditional materials such as Timber, steel, aluminum, and plywood to nontraditional materials such as fiberglass. The systems used can be a combination of two materials. Wood products are the most widely used material for formwork.

What is shuttering in concrete?

Formwork (shuttering) in concrete construction is used as a mould for a structure in which fresh concrete is poured only to harden subsequently. Stripped formwork can be reused. Reusable forms are known as panel forms and non-usable are called stationary forms. Timber is the most common material used for formwork.

Why it is important for formwork to be set out correctly?


Due to the huge costs involved in construction, using good formwork is critical in reducing costs and meeting budget requirements. The use of formwork also enables project managers to facilitate accurate on-time mobilisation and demobilisation of formwork resources which further increases efficiency and reduces costs.

What are the requirements of good formwork?

Requirements Of A Good Formwork:
  • It should be adequately strong to withstand an extensive variety of dead and live loads.
  • It should be inflexibly built and efficiently propped and supported to hold its shape without undue deflection.
  • The joints in the formwork should be tight enough to prevent leakage of cement grout.

What is Type A concrete?

Type 1 - Normal portland cement. Type 1 is a general use cement. Type 2 - Is used for structures in water or soil containing moderate amounts of sulfate, or when heat build-up is a concern. Type 3 - High early strength.